Surveying in Civil Engineering

Please enter your mail id before submitting to get the correct answers on your mail.

1. 

All survey work follows a simple four-step procedure: Select the correct order

2. 

If the staff is not held vertically at a levelling station, the reduced level calculated from the observation would be

3. 

Survey performed to explore site conditions and availability of infrastructures is called

4. 

The first reading taken on a bench mark with levelling staff inverted is entered in the field book as

5. 

Survey performed to prepare a plan or map of a region which includes natural as well as and man-made features including elevation is known as

6. 

The basic principle of surveying is to be able to work out the position of a point from some other point or points, positioning from the known features to the unknown ones.

7. 

In a whole circle bearing system, S250 15' E corresponds to


 

8. 

Closed contours with higher value inwards represents

9. 

In a well-conditioned triangle, no angle should be less than

10. 

Closed contours with higher value Outwards represents


Be sure to click Submit Quiz to see your results!

Please enter your mail id to get the correct answers on your mail. (We don't misuse or display your mail id to anyone)



Name Email